[ Up ] [ System Installation ] [ Site Preaparation ]
Site |
Room |
Power |
Cooling |
Networking |
Notes |
ACES1 |
54-1727 |
Total Capacity OK. 54-1727 has
three 225 amp feeds. This is enough to support about 70KW. The
full system will draw 35KW. The AC will draw about 35KW. |
Total Capacity just OK. AC capacity
in 54-1727 is 140,500 BTU.
Some ducting/vent tiles may need moving. |
Two options are being
examined
-
Install fiber run direct to Stata mezzanine.
(Bob Lanigan to provide estimates).
-
Using existing fiber run to 54-527 (probably
will require short-hop compensation add-on to 10g interface).
This option will not be possible if ACES2 is in E34-500.
Summary of Bob
L estimate, Jan 16 2004 |
- There is an additional set of 64 compute nodes (with Myrinet
switching), 2 management nodes and 8 storage nodes in 54-1727.
The current plan is to integrate these into ACES1.
|
|
|
|
|
|
|
ACES2 |
54-527 |
Needs four extra 15 amp
circuits |
AC capacity at present
is about 28KW. New nodes plus existing hardware will draw
38KW. This means upgrading from an 8 ton (96,000 BTU) unit to a 12
ton (144,000 BTU) unit. Estimated cost of 15ton AC unit (from
CIC Discovery report - appendix H) $14,800 + $1,525
installation. |
Bob Lanigan to provide
estimates for fiber run to Stata mezzanine.
Summary of Bob
L estimate, Jan 16 2004 |
- There is an additional set of 48 compute nodes and 2
management/storage nodes in 54-527. These will be integrated
into ACES2.
|
E34-500 |
Needs site survay |
Needs site survey |
Bob Lanigan to provide
estimates for fiber run to Stata mezzanine.
Summary of Bob
L estimate, Jan 16 2004 |
- There is an additional set of 12, dual-processor compute
nodes in E34-500. The plan is to integrate these into ACES2.
|
|
|
|
|
|
|
ACES3 |
`48-206, 48-208 |
Should be OK |
Should be OK |
Bob Lanigan to provide
estimates for fiber run to Stata mezzanine.
Summary of Bob
L estimate, Jan 16 2004 |
- Building 48 currently undergoing renovation. Equipment will
need to be assembled and housed elsewhere temporarily.
- There is an addional set of 42 dual-processor compute nodes
(with Myrinet switching) and 1 combined storage/management node
to be integrated into ACES3. This set of nodes is currently
housed in W91/W92 while 48-20[6,8] undergoes renovations.
|
|
|
|
|
|
|
ACES4 |
|
OK |
OK |
Summary of Bob L
estimate, Jan 16 2004 |
Stata mezzanine
currently under construction. Equipment may need to be assembled
and housed elsewhere temporarily. |
|
|
|
|
|
|
|
|
|
|